CakeDC Git Workflow is a project development and release work flow which provides a development and release cycle based on key phases:

  • Development: All active development is driven by milestones, and contains the unstable code base in a bleeding edge state.
  • QA: Quality assurance testing figures directly as part of the development cycle, assessing both requirements compliance and acceptance criteria.
  • Review: Clients or reviewers experience a stable code base, passed by a QA process backed up by specific requirements and acceptance criteria.
  • Release: Release are generated after both a QA and a review process.

The initial design of the work flow is based loosely on the gitflow design, by Vincent Driessen. Although there are similarities between each other, they do not infer compatibility.

ORGANIZATION

The principal design of the CakeDC Git Workflow is oriented towards teams or companies which integrate a QA process as part of their development cycle, as well as providing a stable stage server for clients to review and approve the pending release. However, these steps can easily be skipped for those who don't actively provide this as part of their work flow.

The phases through which the full development and releases cycle transpires are broken into objectives, which we refer to as milestones. It's important to note that a milestone doesn't necessarily equate to a release. A version of a project could be composed of multiple milestones, depending on the planning of the project and the resources available.

These phases are represented by "permanent" and "temporary" branches in the git repository, which facilitate the development process through to release. The main reason for the existence of persistent branches is to provision multifaceted deployment, allowing anyone to view the status of an application at different stages of it's development. These 2 types of branches contain the following git branches, which directly form part for the work flow.

Permanent Branches

  • develop Also referred to as bleeding edge, this branch contains the completed features for the current milestone. This is an alpha code base, and considered very unstable.
  • qa All active development for a milestone is eventually tested on this branch. This is a beta code base, and also considered unstable.
  • stage Once development for a milestone has been tested and passed by QA this branch then hosts the now stable c ode base for review.
  • master: After approval has been given by the client or reviewer the staged code base is merged to master, which holds the current version of the project in the production environment.

Temporary Branches

  • feature: These branches are created from the develop branch for the isolated development of a particular task. The definition of feature: is largely dependent on the management style applied to the project, and whether the feature: are in long or short sprints.
  • issue: These branches are created from the qa branch to fix an issue reported by QA while testing a completed milestone.
  • hot-fix: These branches are created to attend to serious and urgent problems detected in the production environment. At best, these branches should never need to be created if the QA process is efficient enough to pass a stable code base to stage for review.

An important difference between "permanent" and "temporary" branches is that no changes can be made directly to a "permanent" branch, they may only be inherited via the merge of a "temporary" branch. The complete process is represented in the diagram below:

In the following sections the phases of the development and release cycle are described individually, explaining the process for each in detail.

Development

During the active development of a milestone developers will create feature branches, based on the code base from the develop branch.

These branches are named "feature/", and followed by the identifier of the task. This would typically be the ID of the ticket in your project management system, for example:

$ git checkout -b feature/1234 develop
$ git push -u origin feature/1234

By separating the task off onto a separate branch developers avoid destabilizing the develop branch to the point where they may be interfering with the work done by others. Additionally, branches can be updated (rebase) with other features already committed to the develop branch, in case some {3} are based on or integrate with others.

By If you're working on the same feature with another developer you can checkout their branch and work on it in conjunction.

$ git checkout -t origin/feature/1234

When the development of a feature is complete, it's merged back into the develop branch, and the feature branch is then deleted.

$ git checkout develop
$ git merge --no-ff feature/1234
$ git branch -d feature/1234
$ git push origin : feature/1234

While the {0} branch is considered unstable, it can be of great benefit to developers to have a server hosting this branch, so they can easily revise the bleeding edge version of the project, aiding in discussion or allowing review of the current progress. This also helps project managers unfamiliar with the development process to get an impression of the real status of the upcoming {1}.

Testing

When a milestone is considered complete, the develop branch is merged into the qa branch, and the QA process begins.

It's important to note that, when develop is merged into qa, any new features constitute the next milestone. This allows for testing of the current milestone as well as development of the next to run in parallel. Additionally, as the QA process is handled on a dedicated branch, this allows the testing phase to be scheduled without impeding the development to continue.

$ git checkout qa
$ git merge --no-ff develop

During the testing phase it's possible that QA may discover issues with the milestone development, and therefore fail some features. When this occurs, the modifications required to rectify these bugs are created as issue branches, based on the code base from the qa branch. These branches are named "issue/", and followed by the identifier of the task. This would typically be the ID of the ticket in your project management or bug tracking system, for example:

$ git checkout -b issue/1234 qa
$ git push -u origin issue/1234

While active, issue branches can also be updated (rebase) with other issues committed to the qa branch, in case one issue depends upon the completion of another. When an issue is resolved, it's merged back into the qa branch, and the issue branch is then deleted.

$ git checkout qa
$ git merge --no-ff issue/1234
$ git branch -d issue/1234
$ git push origin :issue/1234

During the QA phase it's likely that a dedicated testing server would be provisioned. This is where the qa branch would be deployed for the QA team or member to process. The QA phase of the project is ambiguous as to the nature of the testing, as this process can vary significantly depending on the requirements and type of project at hand, so the factors which determine that a milestone is complete or the code base is stable may differ.

Review

Once a milestone has gone through active development, and passed the QA process, the new functionality is now ready to be added to the stage code base for review.

Here, the qa branch is merged into stage, and also merged back into develop for future milestones, for example:

$ git checkout develop
$ git merge --no-ff qa
$ git checkout stage
$ git merge --no-ff qa

Additionally, in order to mark the completion of the milestone, a tag is created from the stage branch. These tags are named "milestone/", and followed by the milestone identifier, which would normally be a sequential number. The tag may also be signed cryptographically with the -s or -u options.

$ git tag -a milestone/1

The stage branch may now be deployed to a staging server for the client or reviewer to approve. If any problems are detected or new functionality defined at this time, they would become part of the currently active milestone on the develop branch, or scheduled for future development.

No changes may be made to the qa or stage branches directly, only through inheritance from a feature branch merged to develop, and then passing through the QA process again. It's extremely important to respect this process, however easy it may seem to just patch the stage branch, as it can compromise the quality assurance process.

Release

When the stage branch has been reviewed, after completing one or many milestones, a release can be created. This is when the code base in the production environment is updated to reflect a new version of the application.

To create the release, the stage branch is merged into master, for example.

$ git checkout master
$ git merge --no-ff stage

Additionally, in order to mark the creation of the release, a tag is created from the master branch. These tags are named "release/", and followed by the version number, which vary between projects depending upon the versioning strategy used. The tag may also be signed cryptographically with the -s or -u options.

$ git tag -a release/1.1.0

All code merged from the qa branch into stage after the new release will now constitute the next version of the application.

Hot Fixes

While the situation should rarely occur when effectively implementing this work flow, there are sometimes urgent bugs detected in the production environment which cannot wait until a pending release is created.

In these cases, a hot-fix branch is created, based on the code base from the master branch. These branches are named "hot-fix/", followed by the identifier of the task. This would typically be the ID of the ticket in your project management system, for example:

$ git checkout -b hot-fix/1234 master
$ git push -u origin hot-fix/1234

Depending on the requirements imposed by QA, it may be necessary to test the resulting patch in the hot-fix after the problem has been resolved. There are 3 ways to approach this issue:

  • Kamakazee: Here the hot-fix is merged directly to master and QA is performed in the production environment. This is highly discouraged, as data inconsistency can result from the bug.
  • Copycat: Here the hot-fix is merged directly to master and the master branch itself is staged on a dedicated server. This may not be possible if the production environment is deployed automatically, based on a pushes to the repository or a scheduled build.
  • Paranoid: Here the hot-fix branch is staged on a dedicated server, for QA to review the patch before it's merged to master. The staged server may need to replicate the data used in the production environment, which may not be an option based on legal agreements or obligations, an alternative being to stage on the production server itself.

Once the patch is successful, the hot-fix branch must also be propagated and merged back into the stage, qa and develop branches.

$ git checkout master
$ git merge --no-ff hot-fix/1234
$ git checkout stage
$ git merge --no-ff hot-fix/1234
$ git checkout qa
$ git merge --no-ff hot-fix/1234
$ git checkout develop
$ git merge --no-ff hot-fix/1234

However, depending on the length of the milestones, it's possible that sufficient changes have been made in the pending release that the problem found in production has already been rectified, or the functionality surrounding the issue has been modified to a point where the problem no longer exists, or has been altered completely.

Finally, once the hot-fix has been applied to all the relevant branches it can now be removed.

$ git branch -d hot-fix/1234
$ git push origin :hot-fix/1234

If you find that there are numerous bugs in your production environment this can be attributed to insufficient details at the requirements stage of the project, or an inefficient QA process. Keep in mind that the QA process is only as good as the initial criteria, so validating the specification for a project is key to it's success.

It's also worth noting that any developer who creates a "temporary" branch should remain responsible for it, as they are the most likely candidates to know the status of the branch.